Turkish Client Case Study: 103 Tons of 34CrMo4 Steel Pipes – Loading & Delivery
Mar 20, 2026
Leave a message
We recently completed a 103-ton order of 34CrMo4 alloy steel tubes for a Turkish client. The project involved strict dimensional tolerances, professional packaging, and safe loading for transport.
Order Details
| Item | Specification |
|---|---|
| Material | 34CrMo4 alloy steel tubes |
| Size | 406mm × 5.5mm |
| Length | 11.8m fixed length |
| Quantity | 103 tons |
Key Challenges
Precise cutting to 11.8m fixed length
Surface protection to prevent scratches during transport
Safe loading of 103 tons to ensure stability
Our Solutions
Precision Cutting – Automated cutting with ±2mm tolerance
Surface Protection – End caps + anti-rust oil + rubber padding between layers
Loading Process – Even weight distribution, steel strapping, and full QC supervision
Results
✅ Zero quality complaints
✅ Third-party inspection passed
✅ On-time delivery with complete documentation
Client Feedback
"Professional 34CrMo4 alloy steel tubes packaging and loading. We appreciate the attention to detail."
Email: judesteel@juqing.hk
Send Inquiry
